Skip to main content
Call
Recovering burned forest with completed emergency stabilization work

Service

Emergency Management and Incident Support

Rapid-response support for wildfire, storm, flood and all-hazards incidents, including fire line construction, debris removal and staging management.

When an incident is active, agencies need contractors who can arrive prepared and work inside an established command structure. Evergreen Forestry Group mobilizes personnel and equipment within 24–48 hours to support wildfire response, disaster recovery and all-hazards incidents.

Problems this service solves

  • Blocked access roads preventing responder entry
  • Debris fields after fire, storm and flood events
  • Containment lines needing mechanical construction support
  • Staging areas requiring management for equipment and personnel

Scope of work

  • Mobilization of personnel and equipment within 24–48 hours
  • On-the-ground support during active wildfires: fire line construction, structure protection and mop-up
  • Post-event debris removal and disposal
  • Access road clearing for emergency responders
  • Fire line construction to aid containment
  • Establishment and management of equipment and personnel staging areas

Methods, equipment and techniques

  • 12 crew trucks, 3 service trucks and 2 fuel trailers
  • 5 × 500-gallon fire suppression trailers
  • Heavy haul and lowbed transport for rapid equipment repositioning
  • ICS-trained personnel for incident coordination

Safety and compliance

Incident work is performed under ICS coordination with firewatch personnel, suppression resources on site and continuous communication with incident leadership.

Process

How the work gets delivered

Every project follows the same sequence, from first site visit through documented closeout.

  1. 01

    Notification

    Resource order received and requirements confirmed.

  2. 02

    Mobilization

    Crews, equipment and support units dispatched.

  3. 03

    Operations

    Assigned work performed under incident direction.

  4. 04

    Demobilization

    Documentation, reporting and equipment return.

FAQs

Emergency Response questions

Answers to the questions most often asked about this scope of work.

Next step

Request a emergency response consultation

Provide site details and timeline. Our estimating team will follow up with the appropriate treatment approach and next steps.

Request a Project Consultation

Share the project details below. A member of our team will review them and follow up with next steps.

Scopes, maps, prescriptions, insurance certificates. PDF, DOC, XLS.

Site photos help our team assess conditions before a visit.

Protected against automated submissions. We never sell or share your information.

Planning a Forestry or Vegetation Management Project?

Tell us about your property, project requirements, timeline and location. Our team will review the details and help determine the appropriate next step.